Supply planning

Supply planning is deciding how demand will be met across the network: what to make, buy and move, where and when, within capacity, lead time and inventory limits.

It takes the demand plan as input and produces the plan everything else executes against: production volumes by site, purchase requirements by supplier and stock deployment by location. In practice it is a stack of calculations, DRP across the distribution network and MPS and MRP inside the plants, checked against capacity and then adjusted by planners wherever the numbers ignore a constraint the system does not hold.

The common failure is planning unconstrained and discovering the constraints in execution. A plan that assumes unlimited capacity or the average lead time looks feasible until the week it is needed. The other is planning each node on its own, where every site and warehouse protects itself and the network ends up holding far more stock than any single plan suggests.