Master Production Schedule
Also: MPS
A Master Production Schedule (MPS) is the committed statement of what will be produced, in what quantity and when, that drives material and capacity planning.
The MPS is where a demand plan becomes a promise. Everything downstream — component orders, labour, capacity — is derived from it, which is why changing it late is expensive in a way that changing a forecast is not.
Healthy MPS discipline shows up as a time fence: a near horizon that is frozen, a middle one that is negotiable, and a far one that is open. Without that, every urgent order reshuffles the factory.
Depends on, and is depended on by
- Material Requirements PlanningMaterial Requirements Planning (MRP) is the process of exploding a production plan through the bill of materials to calculate what components to buy or make, in what quantity and by when.
- Available to PromiseAvailable to Promise (ATP) is the uncommitted stock and planned production that can still be promised to a new customer order with a reliable date.
- Capacity planningCapacity planning is the check that the labour, machines and storage needed by a production plan actually exist in the periods the plan assumes.