Capacity planning
Capacity planning is the check that the labour, machines and storage needed by a production plan actually exist in the periods the plan assumes.
A material plan can be perfectly feasible and still impossible, because the line it assumes is already committed. Capacity planning is the check that stops a plan being published that the floor cannot run.
The constraint is usually narrower than people expect: one machine, one qualified operator, one certification. Planning at aggregate capacity hides the single bottleneck that actually sets throughput.
Depends on, and is depended on by
- Master Production ScheduleA Master Production Schedule (MPS) is the committed statement of what will be produced, in what quantity and when, that drives material and capacity planning.
- Material Requirements PlanningMaterial Requirements Planning (MRP) is the process of exploding a production plan through the bill of materials to calculate what components to buy or make, in what quantity and by when.
- Scenario planningScenario planning is running a plan under alternative assumptions, such as a demand spike, a supplier failure or a cost move, to see the consequence before committing.
- Unconstrained demandUnconstrained demand is what customers would buy if supply, capacity and inventory placed no limit, as distinct from the constrained forecast of what the business can actually ship.
- Advanced Planning and SchedulingAdvanced Planning and Scheduling (APS) is software that plans and sequences production against finite capacity and material availability, rather than the unlimited capacity MRP assumes.
- Mathematical optimizationMathematical optimization is the use of a solver to find the best decision, such as lowest cost or highest service, that satisfies every stated constraint on capacity, stock and supply.