Why AI Data Centers Miss Their Power-On Dates.
Even after securing long-lead equipment.

Projects that secured their transformers and turbines still miss their power-on dates. A Heizen whitepaper on the real cause: slow visibility into switchgear, generator, cooling, and commissioning delays.

What you'll take away

  • Why forty reliable suppliers can still produce a late facility
  • Detection latency: the variable a COO actually controls in 2026
  • The Float-to-Latency Ratio, and eight moves to re-rank your critical path
  • What EO 14421 and Section 232 mean for equipment provenance

Who this is for

For data center COOs, developers, and owner teams accountable for energization dates.