Demand Driven MRP
Also: DDMRP
Demand Driven MRP (DDMRP) is a planning method that places strategic decoupling buffers in the supply chain and replenishes them from actual orders rather than from a forecast.
It works in five steps: position decoupling points, size buffers at them, adjust those buffers dynamically, plan replenishment against the net flow position, and execute by buffer status. Each buffer has red, yellow and green zones. Net flow is stock on hand plus open supply minus qualified customer demand, and an order is raised when it falls into the yellow zone. The forecast sizes buffers but no longer drives orders directly.
The decoupling points do the real work. Placed well, they compress the lead time each customer order actually experiences and stop variability travelling the full length of the bill of materials. Placed badly, or with buffers sized once and never adjusted, DDMRP becomes another reorder-point system with coloured zones. It also changes what planners do all day, which is why adoption stalls on behaviour more often than on mathematics.
Depends on, and is depended on by
- Material Requirements PlanningMaterial Requirements Planning (MRP) is the process of exploding a production plan through the bill of materials to calculate what components to buy or make, in what quantity and by when.
- Safety stockSafety stock is inventory held deliberately above expected demand to absorb variability in demand and supply, and to protect a target service level.
- Bullwhip effectThe bullwhip effect is the amplification of demand variability as orders travel upstream, so small changes at the shelf become large swings at the factory.
- Lead time variabilityLead time variability is the spread in how long replenishment actually takes, as distinct from its average, and a primary driver of required buffer stock.
- Reorder pointA reorder point (ROP) is the stock level that triggers replenishment, set to cover expected demand over the replenishment lead time plus safety stock.