Planning
Lead time variability
Lead time variability is the spread in how long replenishment actually takes, as distinct from its average, and a primary driver of required buffer stock.
Planning on the average lead time guarantees being late roughly half the time. What sizes the buffer is the spread, which is why a supplier averaging 20 days with a range of 14 to 40 is far more expensive to hold stock against than one that reliably takes 28.
Most ERPs store a single lead time field per item, so the variability is invisible unless someone computes it from receipt history. That field being a stale guess is one of the most common causes of buffers that feel wrong to everyone.
Depends on, and is depended on by
- Safety stockSafety stock is inventory held deliberately above expected demand to absorb variability in demand and supply, and to protect a target service level.
- Reorder pointA reorder point (ROP) is the stock level that triggers replenishment, set to cover expected demand over the replenishment lead time plus safety stock.
- Bullwhip effectThe bullwhip effect is the amplification of demand variability as orders travel upstream, so small changes at the shelf become large swings at the factory.
- Supplier scorecardA supplier scorecard is a recurring measure of supplier performance across delivery, quality, price and responsiveness, used to drive review conversations.
- Dual sourcingDual sourcing is buying the same item from two qualified suppliers, so that a failure at one can be covered by the other and neither holds a monopoly on supply.