Days of supply
Also: days on hand · weeks of cover · DOH
Days of supply is the number of days current inventory would last at the expected rate of demand, calculated as stock on hand divided by average daily demand.
It converts a stock quantity into time, which makes items with very different volumes comparable on one report. Divided by forecast demand it looks forward; divided by recent usage it looks back. Days on hand (DOH) and weeks of cover are names for the same idea, the second stated in weeks. It is the time-based counterpart of inventory turns.
A single target in days across the range is the common mistake. Ten days of cover is generous for a stable item with a short, reliable lead time and dangerously thin for a volatile one sourced from far away. The divisor matters too: a demand rate that is about to change, ahead of a promotion or a seasonal peak, makes the number misleading exactly when it matters.
Depends on, and is depended on by
- Inventory turnsInventory turns is the number of times inventory is sold and replaced over a period, calculated as cost of goods sold divided by average inventory held.
- Safety stockSafety stock is inventory held deliberately above expected demand to absorb variability in demand and supply, and to protect a target service level.
- Reorder pointA reorder point (ROP) is the stock level that triggers replenishment, set to cover expected demand over the replenishment lead time plus safety stock.
- Excess and obsolete inventoryExcess and obsolete inventory (E&O) is stock held beyond what demand will consume within a set horizon, or stock that can no longer be sold or used at all.
- StockoutA stockout (OOS) is the condition of having no available inventory of an item when demand arrives, so the order is backordered, substituted or lost.