Confidence threshold
Also: confidence score
A confidence threshold is the cut-off score that decides whether an AI output is accepted automatically or routed to a person, based on how certain the model reports itself to be.
Each extraction, match or classification carries a confidence score, and the threshold splits the stream: an invoice line read with high confidence posts straight through, one below the line goes to an approver. Thresholds can differ by field and by value, so a line description can pass at a lower score than the unit price on a high-value order.
A model’s reported confidence is not automatically the probability that it is right. Scores are often overconfident, and a language model asked to rate its own certainty is less reliable still. Calibrate before trusting the number: measure how often outputs at each score were actually correct on your own documents, set the threshold from the cost of an error against the cost of a review, and recheck it as inputs change.
Depends on, and is depended on by
- Human in the loopHuman in the loop (HITL) is a design where a person reviews or approves the system’s output before it takes effect, usually on the cases that carry the most risk.
- Intelligent Document ProcessingIntelligent Document Processing (IDP) is software that reads documents such as invoices, delivery notes and certificates and turns them into structured, validated data.
- EvaluationEvaluation (evals) is the use of a repeatable test set to measure whether an AI system produces correct output, so changes can be compared instead of judged by impression.
- Management by exceptionManagement by exception is the practice of letting routine transactions proceed automatically and directing people’s attention only to cases that break defined rules or tolerances.
- Model driftModel drift is the degradation in a model’s accuracy over time as the real-world data it sees diverges from the data its behaviour was tuned on.